Property Matters – The Needs Assessment

The Ministry of Planning & the Economy (MPE) announced last week that 10 proposals had been received in response to its RFP for Invader’s Bay.

Given that MPE has not carried out a Needs Assessment for this prime property, for whatever reason, I will continue to outline the relevant elements for the Invader’s Bay property.  This is not intended to be complete, just a list of what I consider to be the critical items a proper Needs Assessment would include –

  • Investment – This is a parcel of land estimated to be worth at least $1.0Bn, so any attempt to describe this process as ‘not being an investment’ would be completely wrong.  In the literal sense, it might not involve any expenditure of State money, but, in every other sense, the disposal of this $1.0Bn asset would constitute a major State investment in Invader’s Bay.
  • The National Interest – At this moment the imperative is to diversify our economy so as to find sustainable replacements for our declining energy revenues, so this is an apt point.  Following on last week’s column, it seems reckless that such an attractive State-owned property would be developed without consideration of the strategic issue.  Even on the conventional basis of announcements of construction jobs and permanent jobs etc., it is difficult on purely financial grounds to justify most types of development on that site, especially given the generally depressed market.  The decisive factor, given the level of interest such a unique offering is likely to attract, would be to have as an identified ‘Need’ that only projects which were net earners of foreign exchange would be considered.  Such a condition would eliminate any offices, apartments, foreign franchise restaurants or shopping malls and set the stage for a different development discussion.  A necessary discussion at this point in our country.  Please note that the RFP does state that the project should generate foreign exchange, but that is only expressed as an ‘expectation’, which is far too flexible, given the influence of the traditional property developers.  If the intention is genuinely to break with the past and set off in a new direction, the conditions need to be strong enough to break the grip of the past.
  • Balanced Development and Lagging areas – The RFP speaks to these concerns as follows – “The Government recognizes the value of long term planning as well as problems created when long term planning is ignored. In order to ensure balanced development and restore lagging areas, care must be taken in the development of new areas…”  Those are real concerns, but they seem at odds with the intention of the RFP, since the execution of that plan gives us yet another major development in our capital.  We should consider if this is an area we want to develop at this time – bearing in mind that scarce private-sector resources may be required in other part of the country – for instance, the San Fernando Waterfront and other areas – so that development can be balanced instead of continuing the last administration’s emphasis on POS.  The sidebar contains a comparison of three large-scale ‘urban development’ districts which formed part of the budget.

There is always the question of who controls the terms of these public debates.  The intention from this side is to have that flawed RFP withdrawn.  To proceed as things stand is to continue on a path which lacks the necessary transparency and public participation.  The quantities of money involved and the absence of those critical elements means that we would be proceeding with all the ingredients for corruption.

This RFP amounts to an invitation to tender, so the bogus idea that this is just a discussion or consideration of proposals must be discredited.  It is nothing of the sort.   This RFP is a tender process to put these valuable public lands into private hands, which is quite different from a consultation.  We have to stop any attempt to mix-up the two processes.

The State and its agencies have an over-riding obligation to be exemplary in their conduct.

SIDEBAR – A budget comparison

The 2012 budget sets out three urban development projects, at pages 31 and 32 –

  • Invader’s Bay – “…significant interest has been expressed in the transformation of the waterfront along Invader’s Bay. This development has great potential for promoting commercial activities in the services sector and will benefit the country significantly. Such projects are meant to be private sector initiatives utilizing green building technologies and will assist in making Trinidad and Tobago an attractive destination for new investments…”
  • Sustainable City Project – East Port of Spain – “…This initiative, is part of a wider “Emerging and Sustainable Cities Initiative” supported by the Inter-American Development Bank of which Port of Spain has been chosen as one of the five pilot cities from170 eligible cities in the hemisphere…This project is being developed in partnership with the East Port of Spain Council of Community Organizations, the Caribbean Network for Urban and Land Management at UWI, the East Port of Spain Development Company, and other key stakeholders. This exercise has also engaged the Making Life Important Initiative of the Ministry of National Security…”
  • Chaguaramas – “…the Chaguaramus Development Authority is spearheading development in the North-Western region and a master plan detailing land use proposals for that region will soon be subject to public discussion…”

Of course those three proposals are favouring Trinidad’s north-west peninsula, which returns to the theme of balanced development, but a further description of their relative merits is beyond the scope of this article.  I am inviting readers to consider the varying approaches to an important long-term large-scale issue such as urban development.

In the cases of east POS and Chaguaramas, the commitment to widespread consultation is manifest, yet there is no such commitment evident in the case of Invader’s Bay, which seems to me to be ‘the jewel in the crown’.  The three current strategic plans for POS, all paid for by Public Money, are being ignored by the very Ministry responsible for Planning.

Good Public Administration requires actions which foster the confidence and trust of the public, that is indisputable.  Those policies and actions must be transparent, reasonable and, above all, consistent, if the public is to place real trust in the hands of the administration.

For all those reasons, it is unwise for any administration to operate in an inconsistent fashion.

In the case of Invader’s Bay, with the stakes so very high, it would be reckless to continue in this manner.

Property Matters – Proper Procurement Practice

My last column addressed the imperative of controlling State expenditure as an element in the national budgeting process. I made the point that a new Public Procurement system needs to come into effect to give us the tools to control these huge expenditures.

The Ministry of Planning & the Economy (MPE) published a Request for Proposals (RFP) at the end of August for the development of Invader’s Bay, a 70-acre parcel of State-owned reclaimed land – shown in this plan  below: invadersbay-sml

The Invader’s Bay lands are absolutely prime property – flat, waterfront land with easy access to highways and all the urban infrastructure of water, electricity and sewers. These are valuable public lands, with an estimated value of at least $1.0Bn.

That RFP invited proposals with a closing-date of 4 October, which is an entirely inadequate 6 weeks. The Joint Consultative Council for the Construction Industry (JCC) has taken a strong position against that RFP process, including writing the MPE and meeting with the Minister, Sen. Dr. Bhoendradatt  Tewarie and Minister of Trade and Industry Stephen Cadiz, MP.

The JCC wants work for its members, but that must be after a proper process, it is not our intention to stop any particular project

The JCC wants a proper participatory process.

The first “official” response to our publicity was an article in the Newsday of Monday 3 October – ‘Cadiz: JCC jumped the gun‘, the leading point being that the government was trying to open-up the procurement process so as to invite suitable proposals.

Cadiz is reported to have said

…What the Government has done is asked interested parties for proposals for concepts,” he said. “I don’t see that there is any issue at all. There were proposals made and the Government felt that this is public land and we should open it up and we gave people six weeks, we feel that is enough time…

Public Procurement can be described as the process which results in the spending or earning of ‘Public Money’.  Public Money is money which is due to or payable by the State, or any debts for which the State is ultimately liable.  Therefore Public Money must include the contracts entered into by the State as well as the disposal, by sale or otherwise, of State assets.  The Invader’s Bay RFP is the start of a large-scale Public Procurement process, since its stated intention is to lease land to developers who make ‘suitable proposals’.

The publication of the RFP and those statements all give the impression that a proper procurement process is underway at Invader’s Bay.

Nothing could be further from the truth.  Let me explain.

The first step in the Procurement cycle is the ‘Needs Identification’.  The two main questions in the case of Invader’s Bay would be –

  1. What do we want to do with this property?  That must also include ones assumptions as to what uses are not desirable there.
  2. Why do we want to do these things?

For example, the answer to the ‘What’ question could be that the property would be used for recreation or parkland.  The answer to the ‘Why’ question could be either for private profit or to create new recreational facilities as a ‘public good’, those being free facilities which increase the amenity of a district or city.  The Brian Lara Promenade and the San Fernando Hill facility are two examples of that.

Without a Needs Assessment it is impossible to objectively assess what is a ‘suitable project’.  To carry out a Needs Assessment, it would have been necessary for the MPE to have consulted widely with the public and stakeholders.  The Invader’s Bay lands are in our capital and are about one-third the size of the Queen’s Park Savannah.  My point being that any proper Needs Assessment must involve substantial public and stakeholder consultation.

There has been no consultation whatsoever.  None.

What is even more unacceptable is that the RFP, which was published by the Ministry of Planning & the Economy, is silent as to the 3 existing strategic plans for the Port-of-Spain area.  The 3 plans are:

  1. Final Draft Development Plan: A Strategic Planning Framework for Metropolitan Port of Spain (Volume 2 Implementation Plan – The Port of Spain City Corporation) [Main Link] [Alternate Link]
  2. A Strategy for the Economic, Social and Physical Transformation of East Port of Spain: East Port of Spain Strategic Development Plan – September 2007
  3. Port of Spain Waterfront Project Strategic Development Plan for lands from Sea Lots to the Mucurapo Foreshore, still unpublished.

All of those plans paid for with Public Money.  A straight case of – ‘nearer to Church, further from God’.

So, how are the proposals to be assessed?  How will the decisions be made?

At para 3.5 of the RFP, at ‘Project Assessment’, we read –

Proposals will be scored using the “Invader’s Bay Development Matrix and Criteria Description”.

We asked for that document when we met with the Ministers, but were told that it would be completed after the closing-date.

In the absence of these rules, how can developers know the ingredients of a winning proposal?  Given that the evaluation rules are due to be completed after the closing-date, how can we be sure that this is a transparent process?

This could be an opportunity to demonstrate best-practice for public procurement, as promised by the People’s Partnership.

What is happening here is a recipe for accusations, blunders and confusion, just like in the previous decades of ‘old politics’.  All the ingredients for corruption are present and that is why the JCC has made this call for the immediate withdrawal of this deeply-flawed RFP and its revision, after wide consultation.

We need to move away from the pattern of the biggest projects being set-up in secret , so that by the time the public gets to hear about it, all the vital details are fixed.

Expediency taking precedence over proper process has long been a costly constant in the governance of our society.

We must do better and it is not too late to do the right thing.

Expenditure of Public money – Accountability – Transparency = CORRUPTION

SIDEBAR: Criticisms by Cadiz

stephencadiz
Minister of Trade and Industry, Stephen Cadiz, MP

It is instructive to consider the criticisms of the JCC which were reportedly made by Cadiz.The headline accused the JCC of ‘jumping the gun’, implying undue haste and thoughtless speed.  Cadiz is quoted as saying, “…I think the JCC jumped the gun,” he said. “If you cannot do it by six week then how long? Six months?”.

At another point in the same article, Cadiz is quoted as saying, “We need to get these things going,” he said. “The JCC only made representation of their disappointment four weeks into the RFP…”  The implication being that the JCC were tardy and should have acted more swiftly.

If this Invader’s Bay situation were not so serious, it would be comical. The question in my mind is ‘Which of those explanations does Minister Cadiz believe?

What seems clear is the hostility with which the Minister views the intervention of the JCC.

Property Matters – Spending and Savings

Discussion is revolving around the country’s earnings from our energy resources and the likely size of the next year’s budget, expected to be delivered in early October.

Given the fact that our energy resources are reported to be declining in both quantity and value, it is very important that we make best use of that stream of resources to both sustain the existing arrangements and create a new series of industries to replace those declining earnings.

In my view, our focus in this critical transitional period has to be on making best use of those limited tax dollars.  Although that is an objective on which we can assume broad consensus, there seems to me to be far too little discussion on the ways in which that can be achieved.

When we consider that most of the capital expenditure in the country takes place via the State and its agencies, it is clear that proper control of that expenditure is key to making the transition for our society.  The other parts of State expenditure are recurrent, such as salaries and rents.

The growth of corruption in State expenditure is a clear danger to good order and national development.  White-Collar crime, as it is sometimes called, is a growth industry because there is almost zero chance of being detected or punished and huge rewards.

The danger to good order is the fact that merit has a declining role in the way State spending decisions are made.  It is clear that other factors have become dominant – things like friends, family and political affiliation are now well-understood to be the ingredients of success in getting work from the State.  That is the case for all political administrations so far in our country, but it must change if we are to make the transition to a sustainable economy in which different values and income sources take the lead.

The budget of the present financial year is the largest in our country’s history and it is true that the major part of that expenditure could be classed as exceptional items, having to deal with settling large debts of State Enterprises and the huge CL Financial bailout payments.  The point here is that those huge expenses arose in situations with a distinct lack of transparency and accountability, from the lack of accounts at UDECOTT and HDC to the naked corruption of the CL Financial bailout, there is a pattern.

If there is no transparency and no accountability, there will be corruption and that is inescapable.

Expenditure of Public money – Accountability – Transparency = CORRUPTION

Public Procurement
Public Procurement refers to any expenditure or receipt of public money, which is money due to, or ultimately payable by, the State.  That definition covers all the Ministries and State agencies as well as modern arrangements such as BOLT, PPP, concessions and so on.  In the PP’s first budget, there were disclosed plans to spend almost $14.0Bn in the capital program of the Ministries and State Agencies.  We need a proper Public Procurement system to manage these vast sums of money.

It is for this reason that the People’s Partnership commitment to implementing a new and effective Public Procurement system is to be welcomed.  The JCC and its partners – the Chamber of Commerce, the Manufacturers’ Association and the Transparency Institute – have submitted a draft Bill for consideration of the Joint Select Committee established by Parliament.

Finance Minister Winston Dookeran made good on the PP’s pre-election promise to lay in Parliament the new Public Procurement proposals within one month of the election.

The level of political support for this initiative has been encouraging, but there is the issue of priorities to confront in this matter.

I am referring to the fact that the second part of the PP commitment to a new and effective Public Procurement system was that it was to have taken effect on the anniversary of the election.

That target has been missed and the work of the Joint Select Committee has been preserved so that it can proceed when the Parliament re-opens at the Waterfront.

The challenge we have to confront is the race to implement public projects in a manner which reminds me of the phrase I had coined for the last administration – ‘Project Fever’, like a new strain of political dengue.

The need to stimulate economic activity is something everyone appreciates and the perceived competition between Ministers is becoming part of the new reality.  Provided that there are effective local content provisions, the more projects the country is doing, means more work for our professionals, contractors, workforce and suppliers.  No one would argue against an increase in economic activity.

The problem is that, in the absence of proper controls, those short-term imperatives can lead directly to the dire long-term consequences which I referred to earlier.  The State now has to spend immense sums to clear up debts which arose during an earlier spending frenzy, with operatives, who would have all said at the time that this or that project was essential.

These frenzied moments of activity are the correct place for the application of real leadership in terms of the national priorities, particularly in relation to the issue of expenditure.  I am calling on Finance Minister Dookeran to make this issue of controlling expenditure a number-one priority in this budget.

Given that the ongoing flow of projects is strong and constant, a proposed program would look like this –

  • New Public Procurement policy – Minister Dookeran must make this new system an absolute priority with a firm commitment to have the new framework made law by the end of this session of Parliament, which is in December.  That is an indispensable part of building a new economy going forward and it would definitely be a manifestation of New Politics.
  • Embargo new projects – In relation to projects which are not yet at the stage of Requests for Proposals, there needs to be an embargo until the new Public Procurement system is in place.  There will be appeals that the struggle is for economic stimulus over proper process, but those must be dismissed.  There is no way you can get to the right place after making a wrong turn.  No way.  Everybody knows that.  Expediency taking precedence over principle has cost our country enormously, both in cash terms and lost opportunity.
  • Projects ‘in the pipeline’ – Projects which are already at the stage of Requests for Proposals must conform with the principles underlying the new Public Procurement proposals – Transparency, Accountability and Value for Money.

Without proper control over expenditure, we will continue to lurch from crisis to crisis.  We need to stabilize the economy and restore the importance of merit in our public decision-making.

AUDIO: High Noon Interview – 22 September 2011

Power 102 FM

Afra Raymond is interviewed on the “Centre Stage” show on Power 102 FM in Trinidad and Tobago, hosted by Chris Seon, Cliff Learmond and Sherma Wilson, on the Colman Commission and the revelations and possible consequences.

  • Programme Date: Thurday, 22 September 2011
  • Programme Length: 0:23:21

The Colman Commission – Preserving Natural Justice

Following my last article on the Colman Commission –Balancing the Scale – in which the recent private meeting of Attorneys was discussed, I wrote the following to its Secretary.

From: Afra Raymond <afraraymond@gmail.com>
To: judith gonzalez <comsecclfhcu@gmail.com>
Sent: Wednesday, September 21, 2011 9:02 AM
Subject: To the Colman Commission

To – Judith Gonzalez, Secretary to the Colman Commission

Dear Ms. Gonzalez,

I was perturbed to learn, only recently, that the Commission had convened a meeting on Friday 8th July at which one of the items discussed was whether my various submissions should be admitted as evidence and if so, what should be the ‘status’ accorded it.

Here we had the situation of a Public Enquiry into a matter of Public concern, convening a private meeting which discussed as one item of business my inclusion as a witness.  As a participant in the Enquiry, not a party, I was excluded from the  discussion as to whether my evidence should be omitted…I was not invited to that meeting and only found about this afterwards, almost in passing.  I also understand that the various parties are to be given the opportunity to make submissions on those issues on my testimony, on which the Commissioner can make a ruling.

My work on this matter of grave public concern has been a solo exercise, except for the occasional assistance of friends. I am without legal representation at this important forum.

Given the substantial parties involved – all of whom are represented by attorneys – and the limits placed on my input by the Commission’s decision to deny me the status of a party, one can scarcely imagine a more lop-sided scenario than this one. Natural Justice is not negotiable.

All that said, the meeting in question has already taken place, so I am requesting that you give proper consideration to inviting my participation when this matter is next to be discussed.

Thank you for your consideration.

Afra Raymond

www.afraraymond.com

Property Matters – The EFCL Query part 5

On Wednesday 21st September I received this letter dated 15th September from EFCL’s attorney together with the Confidentiality Policy Agreement I had requested on 5 September 2011 under the Freedom of Information Act.

As readers can see, this is exactly the document posted as part of the first story in this series, published in the Sunday Guardian on 9th July 2011.  Which means that my essential assertions remain unanswered in that staff who are forbidden to disclose the existence of an agreement would be unable to get external advice on it, without being in breach.  Which has the real effect of giving this document an oppressive flavour.

Of course it also puts into question the assertion in Lalla’s first letter to me, that this new EFCL policy was “…consistent with what obtains in many companies…” Literally unbelievable.  Obviously.

I can only hope that this policy was not approved by our Ministry of Education.

But we will revert to EFCL after the budget season…readers can draw their own conclusions.

The Colman Commission – Balancing the Scale

The Colman Commission into the failure of CLF Financial and the Hindu Credit Union is just about to move into its second round of Hearings and the public can expect to have further testimony on the losses suffered by people who deposited monies with CL Financial.

I have made several submissions to the Commission and have been invited to give evidence.  I am reliably informed that there have been strong and unanimous objections to my participation in the Colman Commission.  It would seem that only the Commission itself is interested in having my testimony go onto the record.

It is not surprising to me that objections of that sort would be arising now, but readers need to have a context.

The Colman Commission was established to find out how this fiasco occurred, recommend methods to stop a recurrence and also to identify responsible people who are apt for lawsuits or criminal charges.  The main parties can be expected to give self-serving evidence, designed to exonerate themselves from any blame.  We can also expect to hear more attempts to put the blame onto Wall Street, despite the claims in the CL Financial 2007 Annual Report– this is from the preamble –

…“The Next Wave of Growth” is the theme of this annual report, highlighting, to quote our Chairman, “that out of any crisis opportunities will emerge and our progress during the year under review prepares us to seize those opportunities and unlock value.” We have confidence in our ability to not only navigate this financial storm but to find fresh and profitable opportunities within it…

That Annual Report was published on 23 January 2009 – yes, that is 10 days after Duprey wrote to the Central Bank Governor for urgent financial assistance and one week before the bailout was signed on 30 January.

The Colman Commission is a Public Inquiry into a matter of major importance; it was approved by the Cabinet and installed by the President of the Republic.  A Commission of Enquiry can only make findings on the evidence submitted to it, so it would be very important for some people to have certain evidence omitted.

One of the most outrageous aspects of the entire Uff Enquiry was the use of public money by UDECOTT to attempt to block certain documents coming into evidence.  Those various attempts to limit the scope of the Uff Enquiry were disgusting to all right-thinking people and seemed to be a straight case of the ‘tail wagging the dog‘.

It is unacceptable that the Ministry of Finance could be taking a position which is seeking to exclude my evidence from the Commission.  If that were so, it would mean that Ministry is acting in a manner which effectively dilutes the Commission and what is more, appears to be incompatible with the intention of the Cabinet to have a full public enquiry into this matter of national concern.  In addition, the Central Bank is also reported to have objected.

The Colman Commission needs to be robust in getting at the truth of this financial disaster.

The new Bailout Plan

At the time of writing I have no details of the new bailout plan, proposed to be laid in Parliament for debate on Wednesday 14 September.  According to a report in the Trinidad and Tobago Guardian, the proposed plan is in two limbs, the first includes the issuance of new bonds to raise monies for the payment of policyholders, while the second is the creation of a prohibition against lawsuits against the Central Bank.

The three concerns I have at this stage are –

  1. Accounts– The last published audited accounts for the CL Financial group were for 2007, but despite the tremendous resources which have been deployed by the State in this matter there is no clue as to when accounts are to be brought up to date.  Given that both the 2009 agreements – the MoU of 30 January 2009 and the CL Financial Shareholders Agreement of 12 June 2009– exist in a framework of State funds being paid to the group’s creditors and recovered by asset sales, this situation is totally unacceptable.  What is more, there has never been any attempt to explain the delay in completing those accounts.

    As a result we have two insurance companies operating in our country without any accounts, which is in breach of the very regulatory framework of the Central Bank.

    The Finance Minister must address these relevant concerns if this proposal is to gain any support.  It brings to mind the recent point made by Independent Senator Subhas Ramkhelewan, in debating the recent proposals to increase the State borrowing limits, that the Parliament needs proper details of the ways in which those monies are proposed to be spent, because no person could borrow money from a diligent lender without giving details.  We need, as a country, to insist on these higher standards.

    We need to move away from the black box and the magician’s hat, towards a more transparent situation in which large-scale public spending decisions are based on a solid series of rationales.

  2. Colman Commission – The concern here is that the second limb of this proposal will prevent lawsuits against the Central Bank; at this point I am not sure if that only applies to CL Financial-related matters.  The Terms of Reference of the Colman Commission state –

    …2. To make such findings, observations ad (sic) recommendations arising out of its deliberations, as may be deemed appropriate, in relation to:

    (i) whether there are any grounds for criminal and civil proceedings against any person or entity; whether criminal proceedings should therefore be recommended to the Director of Public Prosecutions for his consideration; and whether civil proceedings should be recommended to the Attorney General for his consideration;

    It seems to me that the result of these proposals could be to thwart that part of the functions of the Colman Commission as they relate to the Central Bank.

  3. Insurance Act – Finally, I am concerned that as we are on the eve of a possible ‘solution’ to the problems of the policyholders, there may be other fragile insurance companies with solvency issues.  The fact that these matters are now so high on the public agenda means that we should not waste the opportunity to bring forward the new Insurance Bill, which has been drafted for some time, for discussion.

It is at moments like this that a responsible and long-term approach to these huge issues is in the interest of the entire nation.

CORRECTION

In this article, which was published on September 13th 2011, I stated that there were unanimous objections to my appearance as a witness at the Colman Commission. I wrote that on the basis of certain reports given to me by persons who were present at those meetings, but after receiving a challenge from the attorneys for the Trinidad & Tobago Securities & Exchange Commission (TTSEC), it was impossible to corroborate that aspect of the article – i.e. that the TTSEC had objected to my appearance.

This notice is to correct the record in that respect, I do regret any inconvenience or damage caused to the TTSEC by my publication of those allegations. – a Correction with similar effect was published in the Business Guardian of 18th November and I do regret the delay in publishing this one here for blog-readers.

Afra Raymond

Fifth submission to the Commission of Enquiry into the failure of CL Financial Limited, et al

9th September 2011

Afra Raymond’s fifth submission to the

Commission of Enquiry into the failure of
CL Financial Limited
Colonial Life Insurance Company (Trinidad) Limited
Clico Investment Bank Limited
Caribbean Money Market Brokers Limited and
The Hindu Credit Union Credit Union Co-operative Society Limited

My name is Afra Martin Raymond and I am a Chartered Surveyor, being a Fellow of the Royal Institution of Chartered Surveyors.  I am Managing Director of Raymond & Pierre Limited – Chartered Valuation Surveyors, Real Estate Agents and Property Consultants.  I am also the President of the Joint Consultative Council for the Construction Industry (JCC), an umbrella organisation which represents the interests of Engineers, Surveyors, Architects, Town Planners and Contractors in this Republic.

This submission is being made in my personal capacity and does not represent the position of either Raymond & Pierre Limited or the JCC.

My work on this vital issue can be seen at www.afraraymond.com.

I am willing to give oral evidence before the Commission.

This submission is supplementary, providing an update on the work which I have published since the fourth 4th July 2011.

The three articles in this submission are –

Date of Publication Title Abstract
6th July 2011 Colman Commission considerations Questioning the reluctance of persons who lost monies in the CL Financial fiasco to appear as witnesses.
27th July 2011 Lessons from the Financial Crisis Probing the causes and consequences of the crisis.
30th August 2011 The Colman Commission – Cloudy Concessions The concession to allow witnesses’ statements as to the quantum of their investments to go unpublished is critiqued.

I do believe all the items in this submission to be true and correct.

……………………………………………..
Afra M. Raymond B.Sc. FRICS
http://www.afraraymond.com

Apt. #14, Highsquare Condominiums,
1a Dere Street,
Port-of-Spain
625 8168 (h)
678 9802/350 6215 (c)
625 6230 (d)
afraraymond@gmail.com

Property Matters – The EFCL Query part 4

On Friday 2 September, the EFCL’s attorneys delivered to my office this letter dated 8 August 2011.

That letter was written by Larry N. Lalla who warned me in his opening paragraph that EFCL was concerned at the tenor of my articles on their Confidentiality Policy. (Parts 2 and 3 here.)

The letter ended by warning me that EFCL would meet any defamatory statements with legal action…seeing that he never said “…further defamatory statements…” or identified any such, this appears to be yet another waste of taxpayers’ money in an attempt to avoid answering my five original questions.

The intention here seems to be intimidation.

It is sad and ineffective, let me tell you why.

Sad, because, according to clause d. of EFCL’s Staff Confidentiality Policy Statement which was sent to me, employees are forbidden to reveal the terms of the policy or even its very existence.  Lalla’s letter states at 2. that EFCL’s Confidentiality Policy is “…consistent with what obtains in many companies…”.  Both of those cannot be true, since it is simply not the norm that a normal commercial company forbids its employees from even disclosing the existence of a policy.  Those provisions are not at all consistent with what obtains.

The sad part is that the only way to settle this is for EFCL to release its Confidentiality Policy, as I have been requesting.  They have been reluctant to do so, for whatever reason.

EFCL prefers to spend money to obfuscate and intimidate rather than just answer these simple questions, originally contained in my email of 1 July –

  1. Is there a new EFCL Confidentiality policy?
  2. When did that come into effect?
  3. Would you please provide a copy of that policy?
  4. Was that policy approved by the Board of Directors?
  5. Is the Ministry of Education aware of this new policy?

There seems to be an attempt to change the reality that all these State Enterprises are spending public money and therefore ought to be responsive to our reasonable requests.

Earlier today I made a request under the provisions of the Freedom of Information Act and we will see what happens next.

EFCL’s warning letter

efcl-lalla-letterYes, Readers, I received this letter from Larry Lalla, attorneys for the Education Facilities Company Limited (EFCL).

The letter was hand-delivered to my office this morning, although it is dated 8th August – over three weeks ago.

I sent this email in immediate reply:-

From: Afra Raymond <afraraymond@gmail.com>
Date: Fri, Sep 2, 2011 at 4:57 PM
Subject: EFCL’s Confidentiality Policy
To: kiran.shah@efcl.co.tt
Cc: ronald.phillip@efcl.co.tt, larry.lalla@gmail.com

Good Day to you, Mr. Shah,

A copy of EFCL’s attorneys’ letter dated 8th August was hand-delivered to my office earlier today and I will soon be replying to those points in public.

In particular, I noted the third point in that letter –

3. EFCL remains at all times committed to the principles of transparency in all aspects of its operations.”

Accordingly, I am again requesting a copy of the EFCL’s Confidentiality Policy.

Of course I am publishing this, in keeping with our shared commitment to transparency.

Thank you.
Afra Raymond