Invader’s Bay – Suspicious Motives

invadersbay-bwThe proposed development of Invader’s Bay will be the largest in our Capital City in living memory. The entire process is tainted by fundamental irregularities, any one of which ought to be enough to stop the development.

Some of those irregularities at Invader’s Bay include an improper and voidable tendering process; failure or refusal to hold Public Consultations; breach of the Central Tenders’ Board (CTB) Act and most recently, a wrong-sided policy on legal advice.

The State has appealed the High Court decision of Justice Frank Seepersad on 14 July 2014 to order publication of the legal opinions on which they had been relying thus far.  That hearing is now set for Wednesday 28 January 2015 at the Appeal Court in POS. At the preliminary hearing on Thursday 20 November, the State was represented by a seven-member team of attorneys, led by Russell Martineau SC.

Tender rules

Procurement_NoticMinister Tewarie has repeatedly told the public that the Appraisal rules for the Invader’s Bay development were first announced in his speech to the Annual Dinner of the T&T Contractors’ Association on Saturday 5 November 2011. That is true, I was there and heard the Minister do just as he said.  The issue here is that the closing-date stipulated in the Invader’s Bay Request for Proposals (RFP) was 4 October 2011, which was over one month before the rules were published.  Given that fact, the proposers would not have known the rules of the competition and it is fair to say there was no competition at all.  None.  Just imagine the rules for a Calypso competition being distributed the week after the singers had performed.  The RFP process for Invader’s Bay was therefore improper, voidable and illegal.

The most disturbing aspect of this nonsense, is that it raises disturbing questions as to what is fast becoming a new normal in our society.  To my mind, there are two possibilities.

The first is that the Minister was simply unaware that he was describing improper and unlawful acts.  If that is the case, one has to wonder at the quality of advice available to our Cabinet.  Are we now to accept that this is the proper way to proceed?

The second possibility is that the Minister was properly-briefed that the late publication of those rules was improper and that the entire RFP process was therefore voidable, but chose to act as if the whole process was ‘above-board’.  That Minister continues to insist that there is nothing improper taking place at Invader’s Bay and so on.  I tell you. Continue reading “Invader’s Bay – Suspicious Motives”

Advertisement

Reality Check

Dr. Bhoendradatt Tewarie
Dr. Bhoendradatt Tewarie

After a flurry of attempted explanations from the Minister of Planning & Sustainable Development, Dr. Bhoe Tewarie, as to the real meaning of the High Court’s 14 July ruling on the Invader’s Bay matter, the State has now appealed that ruling and applied for expedited hearing of the matter while having the judgment stayed.

What that means is that the State is asking the Court to agree an extension of the Stay of Execution until the appeal is decided, so that the requested information could be withheld while the case is being heard.  Presumably, the State has asked for a speedy hearing so as to avoid any impression of them encouraging needless delay in this matter of high public concern.

This article will focus on the three critical findings in the judgment.  I will be examining Dr. Tewarie’s statement to Parliament on Friday 18 July, alongside the facts and the actual High Court ruling.

  1. Legal Professional Privilege

    The very first point to be made in relation to this is that the reason given by the State for refusing the JCC’s request for this information was not originally ‘legal professional privilege’.

    That reason for refusal was only advanced after the litigation started, literally arising out of the very briefcase of the State’s attorney, on his feet before Justice Seepersad on 4 December 2012.

    We contested the State’s late introduction of these new reasons for refusal, but the Court ruled at para 37 –

    1. The Court…is of the view that the Defendant is entitled to rely upon additional reasons with respect to the refusal to disclose the said information…

    The question of whether the legal opinions are privileged was ruled-upon by Justice Seepersad –

    1. It cannot be disputed that the said information requested, is information that would ordinarily attract legal professional privilege…

    So that issue is not in dispute, in the Court’s mind at least.  I continue to hold the view that it is highly-questionable to easily accept this notion of client confidentiality, given that the State ought to be acting on our common behalf.

    In fact, no evidence was tendered nor was any real case made by the State as to the difficulties which would result from publishing the requested information.  None.  It is only now, with a ruling in the JCC’s favour, that we are getting these positions being advanced.

    For the record, the JCC’s original request under the Freedom of Information Act (FoIA) was for the legal advices and the letters of instruction.

    Consider this, from Dr. Tewarie’s opening statement –

    The very first point that I wish to make with regard to the high court ruling is that there is no issue of disclosure here. There is no issue of failing to disclose or of wanting to withhold disclosures. The Government is not seeking to prevent disclosure of any matter nor is the Government fearful of making any disclosure of fact.

    The only issue we are contesting is whether the advice of an Attorney to his/her client, which is generally regarded as privileged information, is subject to the jurisdiction of the Freedom of Information Act or whether, since it is a privileged exchange of information between Attorney and Client, it is exempt from the Act…”

    If that is truly the case, with the State’s only concern being the possible adverse impact of releasing the legal advices, the question has to be – ‘Why not publish the letters of instruction now?

  2. Waiver of Privilege

    A significant aspect of the case was as to the impact of Dr. Tewarie’s statement to the Senate on 28 February 2012, in reply to a question by then Independent Senator Dr. James Armstrong – see pg 716 of Hansard –

    The answer to (c); the publication of the request for proposals was not the subject of nor required to be in conformity with the Central Tenders Board Act. Advice to this effect was received from the Legal Unit of the Ministry of Planning and the Economy, and subsequently from the Ministry of the Attorney General…

    The point being advanced by the JCC was that a statement like that one, which purports to publicly disclose the very essence of the advice, has the effect of extinguishing the State’s right to suppress the document as being exempted.

    The Court ruled clearly on this –

    1. The gist and nature of the legal advice was in fact revealed when the Minister’s response was made and this amounted to conduct that is inconsistent with the stance that the said legal advice is exempt from being disclosed under the Act by virtue of section 29(1)…

    So, the High Court found that Dr. Tewarie’s statement to the Senate neutralized the State’s ‘legal professional privilege’. That is an important aspect of this ruling, given the frequency with which legal opinions and names are brandished by our leaders, always when convenient, of course.

  3. The Public Interest Test

    This ruling is significant in that Justice Seepersad weighed the existing ‘legal professional privilege’ – making a clear ruling on that at para 41 – against the ‘Public Interest Test’ set out in S.35 of the FoIA.

    At one point it was widely reported that Dr. Tewarie was insisting that the ruling had nothing to do with transparency, but was only on the narrow issue of legal professional privilege.

    The substance of Justice Seepersad’s ruling was at paras 85 & 86 –

    1. The nature of the project in this case and the process adopted by the Defendant to pursue the Request for Proposals process without regard to the provisions of the Central Tenders Board act, requires disclosure of all the relevant information that was considered before the said decision was taken and the refusal to provide the requested information can create a perception that there may have been misfeasance in the process and any such perception can result in the loss of public confidence. Every effort therefore ought to be made to avoid such a circumstance and if there is a valid and legally sound rationale for the adoption of the Request for Proposals process, then it must be in the public interest to disclose it and the rationale behind the process adopted ought not to be cloaked by a veil of secrecy.
    2. The public interest in having access to the requested information therefore is far more substantial than the Defendant’s interest in attempting to maintain any perceived confidentiality in relation to the said information…”

    The real point here is that Justice Seepersad has carried out the Public Interest Test, as mandated at S.35 of the FoIA and ignored by the State in this matter, to find that the ‘legal professional privilege’ is subordinate to the Public Interest in this case, given all the evidence submitted to the Court.

The entire process possesses all the ingredients for corruption, I maintain that view.

Dr. Tewarie has repeatedly claimed that the process was transparent because he disclosed the assessment rules for the Invader’s Bay development at the T&T Contractors’ Association Dinner on Saturday 5 November 2011.  That assertion is perfectly tautological, in that it is entirely true that the rules were revealed for the first time on that occasion, but it does not explain anything of substance.  The decisive fact is that the closing-date for the Invader’s Bay RFP process was 4 October 2011, a full month before the rules were disclosed.  That fact alone renders the entire process voidable and illegal.

What is more, we have to consider the widely-advertised public consultations on the redevelopment of King’s Wharf in San Fernando; the South-Western Peninsula development; the issue of ‘City-status’ for Chaguanas; Constitutional Reform and of course, the latest one, the Civil Society Board.  The glaring question has to be – ‘When is the State hosting the first in its series of Public Consultations on the Invader’s Bay development?

Finally, will this development process continue, while the legal arguments continue?

None So Blind

Property ownership is a critical ingredient of the society we are trying to build.  No one can deny that.   The wealthiest people and companies in this society have made a great part of their wealth through property dealings – buying, leasing, sub-dividing, selling, renovating and so on.  We all know that property is critical to amassing and holding wealth.

The single largest owner of all classes of property in the Republic is of course, the State.  Those properties are described as ‘Public Property‘ in the Public Procurement & Disposal of Public Property Bill 2014 which is now being debated in Parliament.  The penultimate paragraph of the Private Sector Civil Society group (PSCS) group statement of 13 June 2014, is clear –

“…Whilst very pleased with the progress to date and while not having sight of the amended bill we note two areas that remain of serious concern; the Role of civil society and the acquisition and disposal of public property…“.

At pg 7 of that Bill – “public property” means real or personal property owned by a public body;

‘Real Property’ usually means real estate (freehold or leasehold), while ‘Personal Property’ usually means all other types of property such as licenses, concessions and tangible items of worth.

‘Owned’ usually means literally owned, as in the case of a freehold or leasehold interest, but there are other important types of property which are not literally in the ownership of a public body.  Public Property is important because it is extremely valuable.  The power of the State or its agencies to allocate those Public Properties must therefore be exercised in an equitable and transparent fashion if we are to foster proper conduct of our country’s public affairs.

Crown Grants

In relation to real estate, it is important to note that the system of Crown Grants was used during the colonial period to encourage immigrants of a particular type.  Immigrants who were of acceptable race, religious belief or station in life were allocated public lands for the purpose of agriculture.  The actual documents are called ‘Crown Grants’ and they can be seen in our country’s records.  The allocation of those lands to those selected people established a pattern of substantial wealth which took generations to displace.  Of course such a system of property allocation, on the basis of ones’ external appearance and belief system, would be incompatible with our Republican status.

That history and the important role which property plays in today’s society are both reasons why the  ‘disposal of public property‘ is an inescapable part of the new law, so that we can ensure good governance in these matters.

The Maha Saba Episode

This is a good example of a type of Public Property not literally owned by a Public Body.  The dispute was over the decision of the previous administration to allocate radio licenses overnight to the Citadel Group, which was owned by a PNM member, at the same time as delaying the grant of broadcast licenses applied for by the Maha Saba.   The Maha Saba had to take legal action all the way to the Privy Council to obtain a favourable judgment as to the breaches of principles of good public administration by that PNM government. 

A new law intended to control dealings in Public Property as defined above would be one which extended beyond those literally owned by Public Bodies to include species of property in the ‘care, custody or control‘ of those bodies.  That would allow future occurrences of a ‘Maha Saba episode’ to be rapidly rectified, also at less expense, by the Procurement Regulator as that type of property transaction would be within oversight of the new law.

In point of fact, it was reported that the Citadel group which comprised three radio stations was sold in 2012 to the CCN group (owners of this newspaper) in 2012 for a sum reported to be over $50M.  So it is clear that these species of property have serious value, quite apart from any other aspects.

Caroni Lands

When Caroni Ltd. was closed in August 2004, about 76,000  acres came out of cultivation and become available for alternative uses.  The Caroni lands stretch from Orange Grove at Trincity (near the large new Blue Water facility) as far south as Princes Town.

Given the fact that Chaguanas has been our fastest-growing town for almost 20 years now and the ongoing growth of investment in San Fernando and its outlying districts, it is clear that the Caroni lands have a critical role to play in our medium to long-term prospects.  But those possible outcomes would be conditional on just how the Caroni lands are allocated in the short-term.  As far as I am aware, a decade after abandoning sugar cultivation, there is still no strategic plan for how these lands are to be utilised.  In the absence of a proper strategy for the management of those important State lands, there is scope for missed opportunity in terms of development and re-distribution.

The decisive land allocation issues would include –

  • How does the allocation policy work together with the State’s broader economic policies?
  • To whom are the lands allocated?
  • On what terms are the lands allocated – i.e. for how long are the lands to be leased and with what restrictions? Some of the ex-Caroni workers are demanding grants of freehold interests from the State, but no decision seems to have been made on that.
  • Does the State have the right to repossess the lands upon expiry of the lease?
  • Does the allocation strategy have dynamic measures to control speculation?  This is to prevent the growth of ‘flippers’ who just acquire property to hold and re-sell.  There is a serious view that ‘flippers’ are a part of the market, but there is also a way that their presence can retard development as they do not typically improve or maintain their properties.

All of those issues must be located within equitable and transparent arrangements as required by the new  law.

State Leases of offices

When the State leases offices or other property it is in fact procuring property via a transaction in Public Money.  Those transactions must take place within a modern system which ensures good governance by attaining accountability, transparency and value for money.

There is a huge oversupply of offices in greater POS as a result of the State’s overbuilding during the last regime and the current administration is now shifting significant public offices out of POS.  The combined impact of those ought to be a steady decline in both the gross amounts paid to landlords via State leases and the amounts paid per sq. ft..  That kind of change can only be obtained and monitored if the State’s leases of offices and other property are also part of the new Procurement system, so that the details are published as part of the database of State contracts.

Invader’s Bay

The State-owned reclaimed lands at Invader’s Bay in west POS are another pregnant example of how the use of improper land allocation processes can injure the public interest.  The JCC has mounted a legal challenge to seek publication of the legal advice obtained by the Ministry of Planning & Sustainable Development as to the legality of their activity ‘thus far’ in respect of that 70-acre parcel of prime land.

It is interesting to recall that one of the legal opinions on which the State seems to be relying, notes that this proposal was to grant long leases (about 99 years) to the successful bidders at Invader’s Bay.  That was not considered a disposal since the State would have retained the freehold interest.  Now that is probably the best example of why these types of transactions must be controlled by these modern and effective laws.  The attempt to conflate a residual freehold interest with ownership, while at the same time denying the tremendous commercial value of a 99-year lease over prime lands was scandalous.

The most valuable properties in the capital are the leaseholds in St. Clair and Woodbrook, that much is indisputable, which is why we have guard against this kind of evasive advice to facilitate arrangements to escape proper oversight.

The Landed Interests

The ill-fated 2009 proposals for a new Property Tax would have required an updated and open database of the entire country’s property holdings.  The campaign to ‘Axe the Tax’ was successful and that database never saw the light of day, which entirely suited the Landed Interests who are wary of any system which would expose their operations to easy scrutiny.

We need to be vigilant to ensure that the Public Procurement & Disposal of Public Property Bill 2014 does not leave a gaping, purposeful loophole thorough which our Public Money will continue to pour.

Given that our political parties receive financing from business-people, how will those party financiers be rewarded?  In a situation which properly controls the award of State contracts for goods, works and services, how can they be rewarded?

The answer is Public Property.

Invader’s Bay Review

There now needs to be a complete and open review of the Invader’s Bay matter. That is imperative if the public interest is to be safeguarded.

The catalogue of irregular dealings and improper procurement practice at Invader’s Bay has now grown so that we are facing an important moment of decision. At this point there has been no announcement as to an award of contract or grant of any lease, so the threshold of binding legal agreement has not been crossed. In investment language, we are at the ‘inflection point’, which is where the prudent investor has to make a decision to continue or abandon a course of action.

This is the exact moment we should be calling for an open review of this major public project, before any binding commitments are made.

The Commission of Enquiry is an often-used device to probe into matters of serious public concern. In relation to construction and property development, we have had recent CoEs into the Piarco Airport Project, UDECOTT, Land-Date and the Biche School Project, to name a few.

The public has a sceptical attitude to these Commissions, since they never seem bring the desired results in terms of arrests of prominent public officials or disgorgement of stolen monies. Many people dismiss CoEs as ‘talk shops’ set up to enrich lawyers, but I do not dismiss them as effective ways to serve the public interest. Despite the imperfections of the Enquiry process, including the fact that key witnesses can refuse to appear without incurring any serious penalties, there are real benefits. The main one, in my view is that a CoE allows us in the public to learn about major matters of public concern which would likely have remained hidden.

That is the reason we need to retain this process so that the wrongdoing of the past can be exposed, so that we can have the possibility of avoiding those in the future. The weak point of the process is that it always takes place after the crimes have been committed, so during the Bernard Enquiry we were learning about the already-constructed Piarco Airport Terminal. Too late to prevent the massive theft and waste of Public Money.

That is why we need to consider a shift in our approach to the question of enquiries into questionable public projects, since the process is a reactive one, completely unable to stem wrongdoing.

At the ‘inflection point’ now occupied by the Invader’s Bay project, we have an opportunity to examine this large-scale development before any significant expenditure of Public Money so that we can detect and deter wrongdoing. I am not yet settled in my mind as to exactly what type of review is best here, but whatever happens, it must be independent and committed to publication of its findings.

Some of the main issues which such an Enquiry or Review should examine are –

  • Consultation – The complete lack of consultation in this large-scale development proposal for our capital city would be addressed by the process. The land is vested in UDECOTT via a lease and that organisation has repeatedly claimed to have implemented the recommendations of the Uff Report. The 17th of those recommendations states “User groups and other interest groups should be properly consulted on decisions regarding public building projects, to ensure that relevant views can be expressed at the appropriate time and taken into account before decisions are made”. Given the swiftness with which the Couva Children’s Hospital – which is being executed via UDECOTT – emerged in March 2012, we know for sure that those recommendations are not being observed by UDECOTT. Even looking beyond UDECOTT and its conflicting ‘versions’, we can see the contradictory actions of the Ministry of Planning & Sustainable Development supporting a public consultation process at King’s Wharf in San Fernando, yet refusing to hold public consultations on Invader’s Bay in Port-of-Spain.
  • Environmental Concerns – The Invader’s Bay lands are extensive waterfront holdings in State property. They proper development of those lands must take full account of drainage issues and the impact on the environment, including the marine-life issues arising in any waterfront project. I have before me the EMA’s letter of 14 November, which confirms that there have been no requests or Certificate of Environmental Clearance (CEC) applications for the Invader’s Bay lands. In addition, the EMA records provided to me show that the most recent application for a CEC at Invader’s Bay was in January 2007. It is not possible to obtain planning permission without EMA approval, so there are other implications of the lack of these approvals.;
  • There is no link between the RFP and the other three strategic plans for the POS area. That violates the fundamental notion of strategic planning in that existing plans are ignored for no given reason. Piecemeal planning and development is detrimental to the Public Interest. So, who was the author of that RFP and who in the Ministry of Planning approved such a document?;
  • The Request for Proposals (RFP) published by the Ministry of Planning in August 2011 seeking Design-Build proposals for the development of these lands specified an entirely inadequate 6 weeks for submissions. Whose recommendation was it to truncate the development process in this fashion?;
  • The evaluation rules were only published after the closing-date for the tenders, so how did the proposers know what criteria to meet? That late publication is in breach of proper tender procedure, so the entire process is voidable and therefore illegal.
  • Legal Instructions and advice – Also critical to any review process would be the details of the legal advice sought and obtained at various stages of this process. The Ministry is adopting a bizarre, secretive stance in which the advice is claimed to vindicate their actions ‘thus far’, yet that legal advice is being suppressed. The JCC has taken legal action to challenge that unacceptable secrecy in this most public matter.;
  • Infrastructure – The 2014 Budget discloses a $50M allocation for infrastructure at Invader’s Bay, which of course is only a small part of this substantial cost. In the absence of environmental or planning approvals, it is difficult to establish the cost for proposals of this nature, since a design cannot be completed.
  • Allegations of squatting – Finally, we turn to one of the most vexed phrases in our lexicon where land is concerned. The issue of squatting, which is the unauthorised occupation of land not in your ownership. From the sequence of images shown below, we can trace some elementary conclusions:
    1. the first (left) is a map/plan, which uses a dotted line to illustrate the boundary between the Invader’s Bay property and adjoining Port Authority lands to the north…the physical boundary is occupied by a watercourse/ravine and those ‘Port’ lands are occupied by MovieTowne/PriceSmart, a green play park and the Marriott/BHP-Billiton building
    2. the second (middle image) is an aerial photo which shows the Invader’s Bay land bare of vegetation
    3. the third (image at the base) is an aerial photo which shows the Invader’s Bay land re-vegetated with mangrove and what appears to be a bare excision, immediately south of MovieTowne’s western carpark…that is a gravel-paved area, which is south of the watercourse I mentioned earlier…it is accessed via a basic bridge from the said MovieTowne carpark.

    (Click on images to expand)

    I am asking whether MovieTowne has a lease, licence or tenancy agreement to occupy those lands. Does MovieTowne pay any rent, licence fee or charge of any sort for the use and occupation of those lands? What action is UDECOTT taking on this? What action is the Commissioner of State Lands taking on this? It would be unacceptable for an entity in breach of State policy to benefit from the decisions of the State. I hope that is not what we are seeing here.

We need a full, independent and open review of this Invader’s Bay matter. Do you agree?

AUDIO: Heritage Radio Interview: Public Procurement, etc. – 04 December 2013

JCC President Afra Raymond interviewed on Heritage Radio 101.7FM by Hans Hanoomansingh to discuss JCC matters such as Public Procurement, Invader’s Bay and G2G Arrangements. 04 December 2013. Audio courtesy Heritage Radio 101.7 FM

  • Programme Date: Wednesday, 04 December 2013
  • Programme Length: 1:23:27

Invader’s Bay part 3: MORE Invaders Bay Ingredients

Invaders' Bay
Invaders’ Bay

I closed last week’s article by restating my view that all the ingredients for corruption were present at Invader’s Bay.

What are those ingredients?

Here is my list –

  • Extensive public assets coming onto the market, in turbid circumstances. Those assets can include property, concessions, contracts and jobs;
  • Questions of access to the gatekeepers – in these scenarios, some people will have unbelievable access to the decision-makers;
  • Conflicting and confusing versions of the project or proposal. The confusion is as persistent as it is deliberate, a part of the tangled web.
  • Blatant double-standards and lying is the norm in these situations;
  • Apart from ceremonial fluff, such as sod-turnings and ribbon-cuttings, there is no intention whatsoever to give any proper public account or statement of intentions. True transparency is evaded like taxes;
  • Professional Civil Servants who are unable or unwilling to insist on the maintenance of minimum standards;

Extensive Public Assets

These lands are estimated to be worth in excess of $1.2Bn at today’s priced, that means the unimproved value. Although the lands are reclaimed, a significant amount would have to be spent on infrastructure to make the property ‘shovel-ready’ for development.

As I noted in the first in this series, there were conflicting claims on this aspect, with the selected developers claiming extensive infrastructure expenses as a way to reduce what they would pay for the land. There were no estimates given for the developers’ cost of infrastructure, but I noted that the National Budget for 2014 had specified, at pg 89 of the Public Sector Investment Program, that there would be publicly-funded ‘Infrastructure Development’ at Invader’s Bay.

I have been assisted by some of the professionals in the very Ministry of Planning & Sustainable Development in identifying that item as being a $50M allocation for 2014. The actual works are unspecified, so it is difficult to be certain what is included. It certainly seems a modest sum given the size and peculiar challenges posed by the Invader’s Bay property.

In addition to the obvious public asset of the actual property, readers should note that assets in this context can include concessions. In this context that can mean maritime & docking concessions as well as tax concessions, so we will have to maintain full vigilance to safeguard the public interest.

As a first position, all the details of the overall agreements must be published for public consideration at the earliest opportunity. This is no minor point, since really huge sums of wealth can be transferred from public hands to private interests if proper transparency is not ensured. Just remember that in June this year while the President of the Peoples Republic of China was here there was the signing of a Government to Government Agreement. The JCC has lodged many strong objections to those agreements. How many readers will remember that there was an important agreement signed with respect to the Pitch Lake at that time?

To cite a press report

…According to a release from Lake Asphalt of Trinidad and Tobago (1978) Ltd, the signing ceremony of a Memorandum of Understanding and a Confidentiality Agreement with Beijing Oriental Yuhong Waterproofing Technology Co Ltd of the People’s Republic of China is scheduled to take place at the Hyatt Regency, Port of Spain…

So, faced with a Freedom of Information Act which ensures disclosure, the new trend is to wrap-up the details in yet another layer of secrecy. We need to be alert to that trend. After all, this is the same Ministry which claims to have legal advice confirming that its actions conform to the Central Tenders Board Act, yet steadfastly refuse to publish that advice.

Access to the gatekeepers

One of the two successful proposers has been the MovieTowne principal, Derek Chin, whose confidence has been striking.
According to Mr. Chin, in an extensive interview

…Chin has met with the Prime Minister and many government ministers seeking approval for this project.
Before Christmas 2010, he had a meeting with the Transport Minister Jack Warner, Foreign Affairs Minister Suruj Rambachan, and other ministers, at the Prime Minister’s Office. They all supported his plans. “I have been lobbying the Government for a year now, even before the elections. I sent in the preliminary sketches about the concept; I met 19 Cabinet ministers over the last six months. The next minister I am meeting is Bhoe Tewarie, Minister of Planning. He wants to see me. I also met with Jearlean John, Udecott chairman. She also loves it, but that was three to four months ago…

That interview was given in early July 2011, which is over one month before the Request for Proposals was published by the Ministry of Planning & Sustainable Development at the end of August. I tell you.

Conflicting and confusing versions

So, to return to the legal opinions, we have this swirling set of stories.

To date, Minister Tewarie has insisted that the project has been removed from UDeCoTT’s portfolio and placed within the Ministry of Planning. He claims that Cabinet approved this in 2011 and also insists that there is no tender process at Invader’s Bay. Of course it is impossible for the Ministry to proceed to invite tenders for anything without following the Central Tenders Board Act.

The first legal advice I saw was clear that there is indeed a tender process at work here and that the CTB Act ought to have been followed. Obviously, that conclusion did not ‘fit the script’, so an escape hatch had to be fashioned. Shortly thereafter another opinion was submitted by Sir Fenton Ramsahoye SC, on an entirely different set of assumptions which made UDeCoTT the central enabling agency in the entire scheme.

The approach endorsed by the Ramsahoye opinion flatly contradicts the version being advanced by Minister Tewarie.

That is the deep, intentional confusion being encouraged by public officials in this matter.

Blatant double-standards and lying

So, let us start with the role of the Ministry of Planning & Sustainable Development on the Invader’s Bay project. How does that Ministry reconcile its active role in seeking public views on the King’s Wharf project in San Fernando with its silence on Invader’s Bay in POS?

These are blatant double-standards of the worst kind. One can scarcely believe that there are professional civil servants who could condone this reckless and underhanded approach to national development. But there we have it.

When is the Ministry of Planning & Sustainable Development going to host a public consultation on Invader’s Bay? That is now an inescapable requirement. Sooner rather than later.

But that is not all. No, not at all.

This administration campaigned on the findings of the Uff Enquiry and made several public promises to implement the 91 recommendations of the Uff Report. Such was the importance of the matter in the political agenda that it formed the first item of the very first post-Cabinet Press Briefing of the Peoples Partnership administration on 1st July 2010. That is a broken promise, since those Uff recommendations have not been adopted and the JCC’s many attempts to offer our assistance to achieve that have all been rejected.

The 17th recommendation of the Uff Report is –

  1. User groups and other interest groups should be properly consulted on decisions regarding public building projects, to ensure that relevant views can be expressed at the appropriate time and taken into account before decisions are made…

There has been no consultation at all on the Invader’s Bay proposals. Quite frankly, apart from rumours and conflicting press reports, I do not really know exactly what is going to be built or where or even when.

According to the iconic American jurist Louis Brandeis, speaking on eradicating corruption –

‘Sunlight is the best Disinfectant’

Invader’s Bay part 2: All the Ingredients for Bobol…

Since my previous article on this controversial proposal, we have seen that certain legal advice reportedly considered by the government has been featured in another newspaper.  If that is the advice the State is relying upon in advancing their Invader’s Bay proposals, we are seeing a large-scale act of intentional illegality and a worrying return to the ‘bad-old-days.

My main concerns are –

CONSULTATION?

Compare the lack of consultation at Invader’s Bay with what happens elsewhere.  In particular, the large waterfront lands near the city centre of San Fernando at  King’s Wharf, which has been the subject of ongoing public consultations over the years.  The press reports that various design and redevelopment concepts were presented to and discussed with a widely-based audience.

Whatever the criticisms one might make of the King’s Wharf proposals, it is undeniable that views have been sought from the public/stakeholders and various proposals have been made for consideration.

The JCC and its Kindred Associations in Civil Society met with Ministers Tewarie and Cadiz on 26 September 2011 to express our serious concerns.  Yet, when Minister Tewarie was challenged by the JCC and others as to the complete failure to consult with the public, the only example of consultation he could cite was the very meeting we had insisted on, which took place after publication of the Ministry’s Request for Proposals (RFP) and just about one week before the closing-date for proposals.

This Minister obviously does not consider public consultation to be a serious element in real development, notwithstanding the lyrics about innovation, planning and, of course, Sustainability and the Cultural Sector.  Just consider the way in which East Port-of-Spain is being discussed within that same Ministry.  The prospects for sustainable economic development of East POS must be linked with the Invader’s Bay lands, there is no doubt about that.  What is more, to carry-on as though the two parts of the capital can enjoy prosperity in isolation from each other is to trade in dangerous nonsense.  When criticising the large-scale physical development plans of the last administration, ‘dangerous nonsense’ is exactly what I had accused them of dealing in.

Public Administration must be consistent, reasonable and transparent if the public is to be properly-served.  To do otherwise is to encourage disorder and a growing sense that merit is of little value.  The decisive thing has become ‘Who know you’. 

We need to be informed now what planning permissions or environmental approvals have been granted on Invader’s Bay and on what terms.

The Legal advice

I have seen the two legal documents reported on in another newspaper and have to say that those are remarkable documents.

A critical undisputed point, is that the evaluation rules – the “Invader’s Bay Development Matrix and Criteria Description” – were only published after the closing-date.  The JCC made that allegation in its letter of 14 December 2011 and that was confirmed by Minister Tewarie in his Senate contribution on 28 February 2012.  That is a fatal concession which makes the entire process voidable and therefore illegal, since the proposers would have been unfairly treated.

Note carefully that in writing to seek legal advice in response to that challenge of December 2011, the fact that the tender rules were published ex post facto does not seem to have been the subject of a query as to its legal effect.

In one of the legal documents I saw, the penultimate para is chilling in its directness –

…A simple answer to Dr Armstrong’s question on whether the RFP conforms to the (Central) Tenders Board Act is that it does. In reality, the entire tender process was not brought under the CTB Act and the matrix and criteria were forwarded to the tenderers AFTER they submitted their initial proposals to the MoPE…

The ‘simple answer‘, which is what Senator Armstrong got from Minister Tewarie, is that the Central Tenders’ Board Act had been conformed with.  The next sentence is where we enter the other place…let us deconstruct it –

Phrase

Meaning of the phrase

In reality The prior sentence is the official version we are going to tell Senator Armstrong, but here is what really happened.
“…the entire tender process…” Minister Tewarie has consistently held that there was no tender process, this is the State’s senior legal adviser calling that process by its correct title, two weeks before his statement in the Senate.
…“the entire tender process was not brought under the CTB Act…” The tender process was required to be brought under the CTB Act, since it was being done via a Ministry…but that did not happen.
“…the matrix and criteria were forwarded to the tenderers AFTER they submitted their initial proposals to the MoPE…” The State’s senior legal adviser is confirming here that the elementary good practice rules of tendering have been violated, rendering the entire process voidable.

There are two clear findings of illegality in that single paragraph by the State’s senior legal adviser.  Yet a ‘simple answer‘, which was ultimately deceptive, was suggested for Senator Armstrong.

The advice which featured in the press was from Sir Fenton Ramsahoye SC, seemingly obtained after the initial opinion just discussed.

The Ramsahoye opinion was reported to have ‘given Bhoe a green light‘ and so on, but I have serious doubts on that.

  1. Firstly, if there had been clear-cut, solid advice which would have exonerated its actions, the government would have published that so as to silence its critics.
  2. Secondly, having read it myself, their game is a lot clearer.

Ramsahoye’s mind seems to have been directed to the prospect of UDECOTT being granted a head-lease of the entire Invader’s Bay property and then granting sub-leases to the developers selected by the Ministry of Planning.  Those developers would then carry out the proposed development/s.

If that is the way this is proceeding, then there are two serious issues arising on UDeCoTT’s involvement –

  1. The Switch – While it is true that UDeCOTT can lawfully grant the subleases and operate outside the CTB Act, the burning question has to be when was this decision taken to give UDeCoTT that role?  Minister Tewarie has been adamant, since November 2011, that Cabinet took a decision that the Invader’s Bay project be removed from UDeCoTT’s portfolio to be placed within his Ministry.  When did that purported switch back to UDeCoTT take place?  Has Cabinet actually approved such a move?  The first advice looked at the development as it had proceeded and made the conclusions which I criticised above.  The second advice, contemplated a procedure which had been vigorously resisted by the responsible Minister.
  2.  The role of the Board – One of the most vexatious issues to be probed in the Uff Enquiry is the question of to what extent can Cabinet instruct a State Board.  That issue of undue Cabinet influence was also a large contention during the Bernard Enquiry into the Piarco Airport scandal.  Uff concluded, at para 8, that the scope of Ministers’ power to give instructions ought to be clarified.  There are several significant challenges if one accepts the formulation put onto the Invader’s Bay process in Ramsahoye’s opinion. Cabinet would have to instruct that UDeCoTT implement decisions taken by the Ministry of Planning etc.  As we have seen and as the legal advice has clarified, those decisions emerged from unlawful processes.  Is UDeCoTT obliged to follow unlawful instructions?  In the event of litigation, which is increasingly likely, will the members of UDeCoTT’s Board be indemnified by the State for their unlawful acts?   If that were the case, it would be repugnant, with deep echoes of the two earlier large-scale episodes of wrongdoing at Piarco Airport and UDeCoTT projects as cited above.

I stated earlier that this Invader’s Bay matter had all the ingredients for corruption.  I stand by those views.

Invader’s Bay payday?

invadersbay-smlInvader’s Bay has re-emerged from the shadows via PNM Senator Faris Al-Rawi’s budget contribution on Monday 23 September 2013 (pp. 168-175).  The twists and turns in this controversial proposed scheme are detailed at JCC’s webpage.

Invader’s Bay is a 70-acre parcel of reclaimed State land off the Audrey Jeffers Highway – just south of PriceSmart & MovieTowne – in the western part of Port-of-Spain.  Its value was estimated by the State in 2011 to be in excess of $1.2Bn, so these are prime development lands, possessing these attributes –

  • Water, Electricity and all urban services are readily available;
  • Flat/gently-sloping terrain;
  • Direct access to Audrey Jeffers Highway;
  • Waterfront location.

Before proceeding to the latest revelations, it is important to restate the main objections raised by the JCC and others with respect to this proposed development –

  • The Request for Proposals (RFP) was published by the Ministry of Planning in August 2011 seeking Design-Build proposals for the development of these lands and specifying an entirely inadequate 6 weeks for submissions;
  • There has been no public consultation at all, so the public has not been involved in this, the largest proposed development in our capital in living memory;
  • The RFP was silent as to the other three, extant strategic plans for the POS area, all paid for with Public Money.  Given that the RFP was published by the Ministry of Planning, that is a tragic irony, to say the least;
  • EIA – The RFP is silent as to the requirement for an Environmental Impact Assessment in a development of this scale;
  • The proposals were to be evaluated against the “Invader’s Bay Development Matrix and Criteria Description”, which was only published after the closing-date for submissions.  That is a clear breach of proper tender procedure, which renders the entire process voidable and therefore illegal.

Continue reading “Invader’s Bay payday?”

Property Matters – Only a matter of time

whooshThe way the Ministry of Planning & the Economy (MPE) is persisting in their course of action on the Invader’s Bay development is perturbing in terms of the long term consequences of short-term decision-making.

At Section 2.0 of the Request for Proposals (RFP) for Invader’s Bay we read

…For Trinidad and Tobago this is a “major waterfront transformation” along the line of other signature waterfront developments such as Darling Habour (sic) in Sydney, Baltimore Inner Habour (sic), the Habour-front (sic) in Toronto, London Docklands and Teleport City in Tokyo. Although the genesis of the projects may vary, the result has generally been bold and dramatic. With the change in the manner in which ports operate and cargo is transported, waterfront property is now more valuable for its residential, retail and recreational function than simply for port activity with heavy industry, docks and fenced off warehouses, as is the case currently in Port of Spain…

We are being asked to consider the Invader’s Bay initiative ‘along the line’ of other leading international examples, which in itself is a good place to proceed from.  The reality is that those developments cited by the MPE all took decades to conceive and what is more, the authors of the RFP know that.  Yet we are also being asked to believe that a workable concept/s could be devised for Invader’s Bay in an RFP which is silent on the current strategic plans for the capital and only gives proposers 6 weeks to prepare.

Of course the lack of consultation will severely limit the participation of many important developers, not to mention the public.

The point is that in all those cities cited by the RFP, there is a serious commitment to consultation, which means that those large-scale transformations took considerable time to conceptualise.

In the city of New York, for example, there has been a long-standing commitment to community-based development.  Check this 6 October webcast from The New School – the introduction is instructive –

For decades, deliberations over land use in New York City have included developers, community boards, elected officials, the Department of City Planning and other city agencies. Do the people who live and work in city neighborhoods have a sufficient voice? Do residents improve the process, or impede progress? Who is best positioned to determine a neighborhood’s needs, and what are the best structures for public participation? New York has long been a leader in community-based development but as the city recovers from the Great Recession, what does the future hold?

And that is just one reference, readers can ‘Google’ to find the many other supportive examples.  In the very RFP, as well as in the recent budget, there is a clear commitment to consultation in national development.  Except in this case.

But there is more.

As I wrote in the opening of ‘Reflections on Republic Day’, on the Raymond & Pierre website on 27 September 2007 –

The best example I can think of for the kind of broad commitment to consultation is, of course, the site of the World Trade Centre in Lower Manhattan: Ground Zero. This is a very interesting example since the site is privately owned and the City of New York is controlled by the Democrats while the Republicans control the national government of the USA. Against this background of different players we have the fact that the destruction of the WTC was a most severe blow to US prestige and power. The entire defense apparatus was rendered useless by that attack. Arguably, there could be no site in the world with a more urgent claim to large-scale redevelopment.

Yet, the fact is that a sort of compact has been arrived at between the parties to the effect that no redevelopment will take place unless and until everyone has had their say. For example, there was a recently concluded international competition for the design of the 911 Memorial. There were over 5,000 entries from more than 60 countries and a winner was just selected.

As expected, the consultations have been controversial and emotional but the fact is that an environment existed in which such an understanding could work. Whatever one’s view of the American imperium, there is a potency to the existence of that huge crater at the heart of their main city while the necessary conversations go on. Time for us to think again.

At that time I was protesting the haste and waste of the then PNM regime, a consequence of their pattern of proceeding with huge developments without any consultation.

At Section 3.1 of the RFP –

TENURE ARRANGEMENT

The proposed Developer will be chosen via this RFP process and shall then enter into a Memorandum of Understanding (MOU) with the Government of Trinidad and Tobago (Ministry of Planning and the Economy) for an agreed lease rate. It is expected that this activity would be finalized within one (1) month of the submission of the said RFP.

Which means that we can expect the choice of the proposed Developer will be made and the lease agreements completed in one month from the closing date. Yes, Friday 4 November.

Sad to say, there is even more.  The RFP also specifies –

“…If financing has to be sourced from an external source, the Developer MUST submit a letter of guarantee from the financier as well as a profile of the financier. Failure to comply with this requirement will result in disqualification…”

When we raised the point that this is an impossible condition for new bidders to satisfy, given the sheer scale of the proposed development, both Ministers – Tewarie and Cadiz – attempted to indicate that this mandatory condition was flexible. Unbelievable, but true.

As leaders, whether in government or non-governmental organisations, we have an obligation to learn from the past. This is an effort to document the events in this episode, so that there will be a record, when the Invader’s Bay matter comes to be critically examined in the future.

The clear inconsistency of the position taken in the budget on urban planning was highlighted in last week’s column. With respect to this project, we noted the attempt to cast this development in the same light as other examples which all involved long-term consultation, the silence on the existing plans, the impossibly-short timetable to elicit fresh proposals, the even-shorter timetable for selection and agreement of lease terms, the wobbling on the financial requirements and incredibly, that the scoring criteria were to be finalized after the proposals were submitted.

It is literally impossible to determine which of these is worse than the others and it is beyond the imagination of any fiction writer I know to take a plot this far. But this is what is happening in our country today.

In my mind, all of these, taken together, show that the publication of the RFP is a form of sham dialogue and openness. If this is the genuine attempt by the MPE, to properly seek the public interest, then I am giving them an ‘F’ for effort.

What we are seeing here is a recipe for disaster, we already have all the ingredients of corruption, so what is next?

It really does make me wonder who runs this country and when, if ever, can we achieve consistent and equitable government. Who is the real power?